{"id":2406,"date":"2026-05-22T08:53:32","date_gmt":"2026-05-22T06:53:32","guid":{"rendered":"https:\/\/pixeltal.mkw.gmbh\/infopoint\/test-stations-as-part-of-the-plant-design\/"},"modified":"2026-06-18T09:44:23","modified_gmt":"2026-06-18T07:44:23","slug":"test-stations-as-part-of-the-plant-design","status":"publish","type":"post","link":"https:\/\/www.mkw.gmbh\/en\/infopoint\/test-stations-as-part-of-the-plant-design\/","title":{"rendered":"Test stations as part of the plant design"},"content":{"rendered":"<p class=\"wp-block-paragraph\">In automated systems, testing is often considered the final step. The component is manufactured, assembled, or machined, and then inspected. At first glance, this approach seems logical. In practice, however, it has become clear that testing stations need to be planned much earlier.<\/p>\n\n<p class=\"wp-block-paragraph\">A final check detects errors, but it does not prevent them. If deviations do not become apparent until after several process steps, time, materials, and equipment capacity have already been used up. The later an error is detected, the more effort it usually takes to identify it, correct it, or remove it from the process.<\/p>\n\n<p class=\"wp-block-paragraph\">Inspection stations are therefore not just checkpoints, but important components of process control. When positioned correctly, they can detect early on whether a component is properly aligned, whether a dimension is becoming critical, whether an assembly has been performed correctly, or whether a subsequent step can even be carried out effectively.<\/p>\n\n<p class=\"wp-block-paragraph\">This is particularly crucial in interlinked systems. A defective part that continues to operate unnoticed can not only cause scrap itself, but also disrupt subsequent processes. It blocks stations, distorts measurement results, or causes additional interventions during operation.<\/p>\n\n<p class=\"wp-block-paragraph\">The technical challenge lies in not planning testing in isolation. Accessibility, cycle time, component layout, measurement strategy, ejection, and data feedback must be consistent with the system design. A test station that is added later often only works if compromises are made.<\/p>\n\n<p class=\"wp-block-paragraph\">Effective test plans are therefore not developed at the end of the planning phase, but rather in parallel with the process. They not only help document quality, but also make processes more stable, transparent, and manageable.<\/p>\n\n<p class=\"wp-block-paragraph\">Quality assurance is therefore not merely an add-on to automation. It is an integral part of a well-thought-out system design.<\/p>\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.facebook.com\/hashtag\/automatisierung?__cft__[0]=AZakO-JJ0zAyydUHFb66ahUsVHlwgnbEbdT120O4JBIH66W4BgBtGH23JOru1CwHJk6X1JX7jWJQ0Zz0xfQZdjXixUuA4YsWnIpWYlM0dUa-MBFDw8iWXduEGL5E2H1lu_ivIqC0ZwRCdKPHlBvCJ9bZ1PQkOG76djhtdC9eJAFtFsqQbSt1arjnMGaKljINMPE&amp;__tn__=*NK-R\">#Automation<\/a><a href=\"https:\/\/www.facebook.com\/hashtag\/qualit%C3%A4tssicherung?__cft__[0]=AZakO-JJ0zAyydUHFb66ahUsVHlwgnbEbdT120O4JBIH66W4BgBtGH23JOru1CwHJk6X1JX7jWJQ0Zz0xfQZdjXixUuA4YsWnIpWYlM0dUa-MBFDw8iWXduEGL5E2H1lu_ivIqC0ZwRCdKPHlBvCJ9bZ1PQkOG76djhtdC9eJAFtFsqQbSt1arjnMGaKljINMPE&amp;__tn__=*NK-R\">#Quality Assurance<\/a><a href=\"https:\/\/www.facebook.com\/hashtag\/anlagenbau?__cft__[0]=AZakO-JJ0zAyydUHFb66ahUsVHlwgnbEbdT120O4JBIH66W4BgBtGH23JOru1CwHJk6X1JX7jWJQ0Zz0xfQZdjXixUuA4YsWnIpWYlM0dUa-MBFDw8iWXduEGL5E2H1lu_ivIqC0ZwRCdKPHlBvCJ9bZ1PQkOG76djhtdC9eJAFtFsqQbSt1arjnMGaKljINMPE&amp;__tn__=*NK-R\">#Plant Engineering<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>In automated systems, testing is often considered the final step. The component is manufactured, assembled, or machined, and then inspected. At first glance, this approach seems logical. In practice, however, it has become clear that testing stations need to be planned much earlier. A final check detects errors, but it does not prevent them. If &#8230; <a title=\"Test stations as part of the plant design\" class=\"read-more\" href=\"https:\/\/www.mkw.gmbh\/en\/infopoint\/test-stations-as-part-of-the-plant-design\/\" aria-label=\"Read more about Test stations as part of the plant design\">Weiterlesen &#8230;<\/a><\/p>\n","protected":false},"author":4,"featured_media":2407,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[28],"tags":[],"class_list":["post-2406","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-custom-machine-building","no-featured-image-padding"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Test stations as part of the plant design - MKW GmbH<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mkw.gmbh\/en\/infopoint\/test-stations-as-part-of-the-plant-design\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Test stations as part of the plant design - MKW GmbH\" \/>\n<meta property=\"og:description\" content=\"In automated systems, testing is often considered the final step. The component is manufactured, assembled, or machined, and then inspected. At first glance, this approach seems logical. In practice, however, it has become clear that testing stations need to be planned much earlier. A final check detects errors, but it does not prevent them. If ... Weiterlesen ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mkw.gmbh\/en\/infopoint\/test-stations-as-part-of-the-plant-design\/\" \/>\n<meta property=\"og:site_name\" content=\"MKW GmbH\" \/>\n<meta property=\"article:published_time\" content=\"2026-05-22T06:53:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-18T07:44:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.mkw.gmbh\/wp-content\/uploads\/Pruefstationen_post.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t<meta property=\"og:image:height\" content=\"1002\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Sven Goczyla\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Sven Goczyla\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/infopoint\\\/test-stations-as-part-of-the-plant-design\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/infopoint\\\/test-stations-as-part-of-the-plant-design\\\/\"},\"author\":{\"name\":\"Sven Goczyla\",\"@id\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/#\\\/schema\\\/person\\\/42506b03b0a28351fefd62ef9c5ab0ba\"},\"headline\":\"Test stations as part of the plant design\",\"datePublished\":\"2026-05-22T06:53:32+00:00\",\"dateModified\":\"2026-06-18T07:44:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/infopoint\\\/test-stations-as-part-of-the-plant-design\\\/\"},\"wordCount\":298,\"publisher\":{\"@id\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/infopoint\\\/test-stations-as-part-of-the-plant-design\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.mkw.gmbh\\\/wp-content\\\/uploads\\\/Pruefstationen_post.png\",\"articleSection\":[\"Custom Machine Building\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/infopoint\\\/test-stations-as-part-of-the-plant-design\\\/\",\"url\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/infopoint\\\/test-stations-as-part-of-the-plant-design\\\/\",\"name\":\"Test stations as part of the plant design - MKW GmbH\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/infopoint\\\/test-stations-as-part-of-the-plant-design\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/infopoint\\\/test-stations-as-part-of-the-plant-design\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.mkw.gmbh\\\/wp-content\\\/uploads\\\/Pruefstationen_post.png\",\"datePublished\":\"2026-05-22T06:53:32+00:00\",\"dateModified\":\"2026-06-18T07:44:23+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/infopoint\\\/test-stations-as-part-of-the-plant-design\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/infopoint\\\/test-stations-as-part-of-the-plant-design\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/infopoint\\\/test-stations-as-part-of-the-plant-design\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.mkw.gmbh\\\/wp-content\\\/uploads\\\/Pruefstationen_post.png\",\"contentUrl\":\"https:\\\/\\\/www.mkw.gmbh\\\/wp-content\\\/uploads\\\/Pruefstationen_post.png\",\"width\":1500,\"height\":1002,\"caption\":\"Test stations as part of the plant design\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/infopoint\\\/test-stations-as-part-of-the-plant-design\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Start\",\"item\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/home\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Test stations as part of the plant design\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/\",\"name\":\"MKW GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/#organization\",\"name\":\"MKW GmbH\",\"url\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.mkw.gmbh\\\/wp-content\\\/uploads\\\/logo-grey.svg\",\"contentUrl\":\"https:\\\/\\\/www.mkw.gmbh\\\/wp-content\\\/uploads\\\/logo-grey.svg\",\"width\":149,\"height\":54,\"caption\":\"MKW GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.mkw.gmbh\\\/en\\\/#\\\/schema\\\/person\\\/42506b03b0a28351fefd62ef9c5ab0ba\",\"name\":\"Sven Goczyla\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Test stations as part of the plant design - MKW GmbH","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mkw.gmbh\/en\/infopoint\/test-stations-as-part-of-the-plant-design\/","og_locale":"en_US","og_type":"article","og_title":"Test stations as part of the plant design - MKW GmbH","og_description":"In automated systems, testing is often considered the final step. The component is manufactured, assembled, or machined, and then inspected. At first glance, this approach seems logical. In practice, however, it has become clear that testing stations need to be planned much earlier. A final check detects errors, but it does not prevent them. If ... Weiterlesen ...","og_url":"https:\/\/www.mkw.gmbh\/en\/infopoint\/test-stations-as-part-of-the-plant-design\/","og_site_name":"MKW GmbH","article_published_time":"2026-05-22T06:53:32+00:00","article_modified_time":"2026-06-18T07:44:23+00:00","og_image":[{"width":1500,"height":1002,"url":"https:\/\/www.mkw.gmbh\/wp-content\/uploads\/Pruefstationen_post.png","type":"image\/png"}],"author":"Sven Goczyla","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Sven Goczyla","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.mkw.gmbh\/en\/infopoint\/test-stations-as-part-of-the-plant-design\/#article","isPartOf":{"@id":"https:\/\/www.mkw.gmbh\/en\/infopoint\/test-stations-as-part-of-the-plant-design\/"},"author":{"name":"Sven Goczyla","@id":"https:\/\/www.mkw.gmbh\/en\/#\/schema\/person\/42506b03b0a28351fefd62ef9c5ab0ba"},"headline":"Test stations as part of the plant design","datePublished":"2026-05-22T06:53:32+00:00","dateModified":"2026-06-18T07:44:23+00:00","mainEntityOfPage":{"@id":"https:\/\/www.mkw.gmbh\/en\/infopoint\/test-stations-as-part-of-the-plant-design\/"},"wordCount":298,"publisher":{"@id":"https:\/\/www.mkw.gmbh\/en\/#organization"},"image":{"@id":"https:\/\/www.mkw.gmbh\/en\/infopoint\/test-stations-as-part-of-the-plant-design\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mkw.gmbh\/wp-content\/uploads\/Pruefstationen_post.png","articleSection":["Custom Machine Building"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.mkw.gmbh\/en\/infopoint\/test-stations-as-part-of-the-plant-design\/","url":"https:\/\/www.mkw.gmbh\/en\/infopoint\/test-stations-as-part-of-the-plant-design\/","name":"Test stations as part of the plant design - MKW GmbH","isPartOf":{"@id":"https:\/\/www.mkw.gmbh\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.mkw.gmbh\/en\/infopoint\/test-stations-as-part-of-the-plant-design\/#primaryimage"},"image":{"@id":"https:\/\/www.mkw.gmbh\/en\/infopoint\/test-stations-as-part-of-the-plant-design\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mkw.gmbh\/wp-content\/uploads\/Pruefstationen_post.png","datePublished":"2026-05-22T06:53:32+00:00","dateModified":"2026-06-18T07:44:23+00:00","breadcrumb":{"@id":"https:\/\/www.mkw.gmbh\/en\/infopoint\/test-stations-as-part-of-the-plant-design\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mkw.gmbh\/en\/infopoint\/test-stations-as-part-of-the-plant-design\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mkw.gmbh\/en\/infopoint\/test-stations-as-part-of-the-plant-design\/#primaryimage","url":"https:\/\/www.mkw.gmbh\/wp-content\/uploads\/Pruefstationen_post.png","contentUrl":"https:\/\/www.mkw.gmbh\/wp-content\/uploads\/Pruefstationen_post.png","width":1500,"height":1002,"caption":"Test stations as part of the plant design"},{"@type":"BreadcrumbList","@id":"https:\/\/www.mkw.gmbh\/en\/infopoint\/test-stations-as-part-of-the-plant-design\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Start","item":"https:\/\/www.mkw.gmbh\/en\/home\/"},{"@type":"ListItem","position":2,"name":"Test stations as part of the plant design"}]},{"@type":"WebSite","@id":"https:\/\/www.mkw.gmbh\/en\/#website","url":"https:\/\/www.mkw.gmbh\/en\/","name":"MKW GmbH","description":"","publisher":{"@id":"https:\/\/www.mkw.gmbh\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mkw.gmbh\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.mkw.gmbh\/en\/#organization","name":"MKW GmbH","url":"https:\/\/www.mkw.gmbh\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mkw.gmbh\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.mkw.gmbh\/wp-content\/uploads\/logo-grey.svg","contentUrl":"https:\/\/www.mkw.gmbh\/wp-content\/uploads\/logo-grey.svg","width":149,"height":54,"caption":"MKW GmbH"},"image":{"@id":"https:\/\/www.mkw.gmbh\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.mkw.gmbh\/en\/#\/schema\/person\/42506b03b0a28351fefd62ef9c5ab0ba","name":"Sven Goczyla"}]}},"_links":{"self":[{"href":"https:\/\/www.mkw.gmbh\/en\/wp-json\/wp\/v2\/posts\/2406","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mkw.gmbh\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mkw.gmbh\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mkw.gmbh\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mkw.gmbh\/en\/wp-json\/wp\/v2\/comments?post=2406"}],"version-history":[{"count":1,"href":"https:\/\/www.mkw.gmbh\/en\/wp-json\/wp\/v2\/posts\/2406\/revisions"}],"predecessor-version":[{"id":2418,"href":"https:\/\/www.mkw.gmbh\/en\/wp-json\/wp\/v2\/posts\/2406\/revisions\/2418"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mkw.gmbh\/en\/wp-json\/wp\/v2\/media\/2407"}],"wp:attachment":[{"href":"https:\/\/www.mkw.gmbh\/en\/wp-json\/wp\/v2\/media?parent=2406"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mkw.gmbh\/en\/wp-json\/wp\/v2\/categories?post=2406"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mkw.gmbh\/en\/wp-json\/wp\/v2\/tags?post=2406"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}